Expansion of the Vyngapurovsky GPP. Turnkey construction of 2 pre-fabricated buildings of modular complete transformer substations

Since 2006, NIPOM has been participating in programs on construction and upgrade of the facilities of subsidiaries of SIBUR Holding PJSC. Under the programs, NIPOM has implemented more than 15 projects comprising the supply of various types of equipment: for distribution of low and medium voltage power, power transformers, reactive power compensation devices, digital excitation systems of synchronous machines, DC systems, etc.

In 2014, NIPOM supplied in an integrated manner complete two-transformer 1,600 kVA substations to the facility – Vyngapurovsky GPP. Construction of Gas Processing Plant 2.

Description of the Project

The integrated supply of two complete two-transformer substations with dry 1,600 kVA transformers for a rated voltage of 6 kV on the HV side and 0.4 kV on the LV side in a modular complete unit included:

  • development of a design for the equipment to be supplied;
  • manufacture of prefabricated buildings with installed systems: heating, ventilation, air conditioning and fire and intrusion alarm;
  • high-voltage switchgears;
  • TSZGLF 1600/6/0.4 transformers from “Minsk Electrotechnical Plant named after V.I. Kozlov”;
  • low-voltage switchgears based on a low-voltage complete device from NIPOM;
  • installation supervision and commissioning of the equipment.

Results

The integrated supply of modern electrical equipment for the Vyngapurovsky GPP will provide trouble-free and reliable power supply, uninterrupted output of products of SIBUR Holding PJSC.

SIBUR Holding PJSC, SiburTyumenGaz JSC, Vyngapurovsky GPP

Yamalo-Nenets District, Noyabrsk (Industrial Area)

Gas processing